Construction work has started at Notre Dame Catholic College as part of the Building Schools for the Future (BSF) programme.

The structure comprises a structural steel frame, pre-cast concrete floors and glu-lam roof beams. The school is being built on a site close to a major regeneration scheme called ‘Project Jennifer’ which has seen a huge investment to this area of north Liverpool. Set to be completed in summer 2013 the new College will provide much needed modern facilities for use by students and the local community.

What the customer thought

“The Installation Of Easi-Edge Has Been A Great Success. Our Operatives Were Able To Install The Barrier Very Quickly And Efficiently. The Service We Have Received From Easi-Edge Has Been Very Professional From The Start.”

Peter Clayton (Technical Contracts Manager – B&K Structures)

End Client

NOTRE DAME CATHOLIC COLLEGE

Main Contractor

Willmott Dixon

Structural Contractors

B&K Structures Ltd.

Order Details

easi-edge have supplied in the region of 1200 linear metres of bolt-on edge protection and stair protection. During the construction phases, Willmott Dixon will be utilising our bay-master solution for safe offloading at designated loading bays.