Skip links

Furness Academy

LIVERPOOL

easi-edge has supplied their edge protection system to a new Academy project in Barrow in Furness. Furness Academy will set the standard for education provision within Barrow and will provide high quality, state of the art facilities for students, staff and the wider community.

The Academy is due to be completed in September 2013 and will accommodate 1,200 pupils.

What the customer thought

“The system minimises the risks of working at height, it is faster to install and more versatile than traditional scaffolding edge protection.”

Robert Olley (Senior Project Manager – Kier Eastern)

End Client

FURNESS COLLEGE

Main Contractor

Kier Construction

Structural Contractors

B&K Structures Ltd.

Order Details

easi-edge has supplied in excess of 1500 linear metres of surface fix edge protection, detailed to the exact requirement of the three storey, structural timber frame. Internally, the company’s innovative core-safe gate solution was utilised to secure lift shaft voids whilst the construction continues. Loading bays have been protected with bay-master, which constantly protects operatives whilst loading materials at height. At all levels of the building, access gates have been utilised to provide easy access for operatives to all floor levels without disrupting the edge protection.